OPERATIONS CARRIED OUT:

 

From 2005-2007, Magico treated 380,000 tonnes of soil from reclamation sites or the management of excavation plans.


IN COMPLETION:

  • 2007/2008: Building excavation management plans in the Repubblica-Garibaldi area (Milan)
    Stage II earth and rock from excavation – 210,000.00 tons
      

COMPLETED RECLAMATION:

  • 2007: Former petroleum deposit
    Via Colico, Milan
    Soil contaminated by hydrocarbons – 4,670.00 tons

  • 2006: Demolition and reclamation of the former Oleoblitz area
    Milan
    Soil contaminated by PAH – hydrocarbons – 7,500.00 tons
          Area Ex Area Oleoblitz

  • 2005/2006: Reclamation work in the Repubblica-Garibaldi area
    Milan – Stage I
    soil contaminated by metals and hydrocarbons –190,000.00 tons
          

  • 2003: Former hospital thermal power plant
    Turin
    soil contaminated by hydrocarbons and heavy metals – 20,000 tons.

  • 2000/2001: Former petroleum products refinery
    Rho (Milan)
    soil contaminated by hydrocarbons – 25,000 tons.

  • 2001/2002: Former steelworks
    Sesto S. Giovanni (Milan)
    soil contaminated by hydrocarbons and heavy metals – 35,000 tons.

  • 2001/2002: Former electro-mechanical factory
    Merano (Bolzano)
    soil contaminated by heavy metals – 25,000 tons


  • 2002: Former paint factory
    Cormano (Milan)
    Making the area safe, identification of the refuse deposited with reconditioning, collection and sending for treatment – 330 tons.


  • 1998/1999: Former aluminium works
    Bolzano
    Demolition of the production areas of the aluminium refinery with the resulting production of 10,000 tons of aluminium residue, sent for recycling directly in the cement works.