From 2005-2007, Magico treated 380,000 tonnes of soil from reclamation sites or the management of excavation plans.
IN COMPLETION:
2007/2008: Building excavation management plans in the Repubblica-Garibaldi area (Milan)
Stage II earth and rock from excavation – 210,000.00 tons
COMPLETED RECLAMATION:
2007: Former petroleum deposit
Via Colico, Milan
Soil contaminated by hydrocarbons – 4,670.00 tons
2006: Demolition and reclamation of the former Oleoblitz area
Milan
Soil contaminated by PAH – hydrocarbons – 7,500.00 tons
2005/2006: Reclamation work in the Repubblica-Garibaldi area
Milan – Stage I
soil contaminated by metals and hydrocarbons –190,000.00 tons
- 2003: Former hospital thermal power plant
Turin
soil contaminated by hydrocarbons and heavy metals – 20,000 tons.
- 2000/2001: Former petroleum products refinery
Rho (Milan)
soil contaminated by hydrocarbons – 25,000 tons.
- 2001/2002: Former steelworks
Sesto S. Giovanni (Milan)
soil contaminated by hydrocarbons and heavy metals – 35,000 tons.
- 2001/2002: Former electro-mechanical factory
Merano (Bolzano)
soil contaminated by heavy metals – 25,000 tons
- 2002: Former paint factory
Cormano (Milan)
Making the area safe, identification of the refuse deposited with reconditioning, collection and sending for treatment – 330 tons.
- 1998/1999: Former aluminium works
Bolzano
Demolition of the production areas of the aluminium refinery with the resulting production of 10,000 tons of aluminium residue, sent for recycling directly in the cement works.